Our work

    Installation Málaga

    • Installation Installation 24 Modules
      with Battery
    • Amortization Amortization 8 years
    • Energy saving Energy saving 78%
    • Power installed Power installed 9.6 kWp
    1  |  2

    Installation Colegio Puertosol, Málaga

    • Installation Installation 150 Modules
    • Amortization Amortization 4 years
    • Energy saving Energy saving 64%
    • Power installed Power installed 69 kWp
    1  |  1

    Installation La Finca, Marbella

    • Installation Installation 26 Modules
    • Amortization Amortization 6 years
    • Energy saving Energy saving 79%
    • Power installed Power installed 10.54 kWp
    1  |  3

    Installation Periana, Axarquía

    • Installation Installation 10 Modules
    • Amortization Amortization 6 years
    • Energy saving Energy saving 46%
    • Power installed Power installed 4 kWp
    1  |  2

    Installation Málaga

    • Installation Installation 10 Modules
      with Battery
    • Amortization Amortization 10 years
    • Energy saving Energy saving 83%
    • Power installed Power installed 4 kWp
    1  |  3

    Installation Bic Euronova S.A, Málaga

    • Installation Installation 80 Modules
    • Amortization Amortization 2 years
    • Energy saving Energy saving 20%
    • Power installed Power installed 36.80 kWp
    1  |  4

    Installation Marbella

    • Installation Installation 31 Modules
      with Battery
    • Amortization Amortization 4 years
    • Energy saving Energy saving 65%
    • Power installed Power installed 9.61 kWp
    1  |  3

    Installation Áridos El Pinar S.A, Alhaurín De La Torre

    • Installation Installation 145 Modules
    • Amortization Amortization 1 years
    • Energy saving Energy saving 6%
    • Power installed Power installed 66.69 kWp
    1  |  4

    Installation Altos de Puente Romano, Marbella

    • Installation Installation 18 Modules
      with Battery
    • Amortization Amortization 6 years
    • Energy saving Energy saving 76%
    • Power installed Power installed 7.20 kWp
    1  |  1

    Installation Aripisa, Málaga

    • Installation Installation 70 Modules
    • Amortization Amortization 6 years
    • Energy saving Energy saving 67%
    • Power installed Power installed 32.2 kWp
    1  |  4

    Installation Rancho Miraflores, Mijas

    • Installation Installation 118 Modules
    • Amortization Amortization 4 years
    • Energy saving Energy saving 40%
    • Power installed Power installed 47.2 kWp
    1  |  3

    Installation Málaga

    • Installation Installation 23 Modules
      with Battery
    • Amortization Amortization 12 years
    • Energy saving Energy saving 72%
    • Power installed Power installed 7.75 kWp
    1  |  7

    Installation Las Chapas, Marbella

    • Installation Installation 32 Modules
      with Battery
    • Amortization Amortization 10 years
    • Energy saving Energy saving 72%
    • Power installed Power installed 10.08 kWp
    1  |  2

    Installation La Cala de Mijas

    • Installation Installation 12 Modules
    • Amortization Amortization 7 years
    • Energy saving Energy saving 60%
    • Power installed Power installed 3.84 kWp
    1  |  2

    Installation Disofic, Málaga

    • Installation Installation 108 Modules
    • Amortization Amortization 5 years
    • Energy saving Energy saving 60%
    • Power installed Power installed 48.5 kWp
    1  |  2

    Installation Más Social, Málaga

    • Installation Installation 56 Modules
    • Amortization Amortization 2 years
    • Energy saving Energy saving 55%
    • Power installed Power installed 25.2 kWp
    1  |  2

    Installation The Oliv, Mengíbar

    • Installation Installation 240 Modules
    • Amortization Amortization 5 years
    • Energy saving Energy saving 43%
    • Power installed Power installed 110.04 kWp
    1  |  3