-
Installation Málaga
-
Installation 24 Modules
with Battery -
Amortization 8 years
-
Energy saving 78%
-
Power installed 9.6 kWp
-
-
Installation Colegio Puertosol, Málaga
-
Installation 150 Modules
-
Amortization 4 years
-
Energy saving 64%
-
Power installed 69 kWp
-
-
Installation La Finca, Marbella
-
Installation 26 Modules
-
Amortization 6 years
-
Energy saving 79%
-
Power installed 10.54 kWp
-
-
Installation Periana, Axarquía
-
Installation 10 Modules
-
Amortization 6 years
-
Energy saving 46%
-
Power installed 4 kWp
-
-
Installation Málaga
-
Installation 10 Modules
with Battery -
Amortization 10 years
-
Energy saving 83%
-
Power installed 4 kWp
-
-
Installation Bic Euronova S.A, Málaga
-
Installation 80 Modules
-
Amortization 2 years
-
Energy saving 20%
-
Power installed 36.80 kWp
-
-
Installation Marbella
-
Installation 31 Modules
with Battery -
Amortization 4 years
-
Energy saving 65%
-
Power installed 9.61 kWp
-
-
Installation Áridos El Pinar S.A, Alhaurín De La Torre
-
Installation 145 Modules
-
Amortization 1 years
-
Energy saving 6%
-
Power installed 66.69 kWp
-
-
Installation Altos de Puente Romano, Marbella
-
Installation 18 Modules
with Battery -
Amortization 6 years
-
Energy saving 76%
-
Power installed 7.20 kWp
-
-
Installation Aripisa, Málaga
-
Installation 70 Modules
-
Amortization 6 years
-
Energy saving 67%
-
Power installed 32.2 kWp
-
-
Installation Rancho Miraflores, Mijas
-
Installation 118 Modules
-
Amortization 4 years
-
Energy saving 40%
-
Power installed 47.2 kWp
-
-
Installation Málaga
-
Installation 23 Modules
with Battery -
Amortization 12 years
-
Energy saving 72%
-
Power installed 7.75 kWp
-
-
Installation Las Chapas, Marbella
-
Installation 32 Modules
with Battery -
Amortization 10 years
-
Energy saving 72%
-
Power installed 10.08 kWp
-
-
Installation La Cala de Mijas
-
Installation 12 Modules
-
Amortization 7 years
-
Energy saving 60%
-
Power installed 3.84 kWp
-
-
Installation Disofic, Málaga
-
Installation 108 Modules
-
Amortization 5 years
-
Energy saving 60%
-
Power installed 48.5 kWp
-
-
Installation Más Social, Málaga
-
Installation 56 Modules
-
Amortization 2 years
-
Energy saving 55%
-
Power installed 25.2 kWp
-
-
Installation The Oliv, Mengíbar
-
Installation 240 Modules
-
Amortization 5 years
-
Energy saving 43%
-
Power installed 110.04 kWp
-